Weekend Update: November 7th and 8th
John and I spent most of this past weekend working on the truck. The primary goal that we accomplished was connecting the alternator to the rear battery pack (henceforth referred to as the “Atomic Pile,” a reference to Batman). In order to tap into the 60 Amp output of the alternator we had to run some wire from the Atomic Pile and into either the stock battery box or the engine compartment. John thought it would be nice to be able to disconnect and monitor the power flow from the cabin, so we decided on routing the cable under the cab, through the engine bay, and into the cab. Once inside the cab the circuit runs through a 60 Amp fuse, an ammeter, and (hopefully soon) a heavy duty switch. We weren’t able to get our hands on a switch this weekend, but we’re going to keep looking for one.
