Archive

Archive for February 10th, 2010

Charging the Battery Bank

February 10th, 2010
Comments Off

During the testing of the UPS system I drained the batteries rather low. To recharge the batteries I can either run the Diesel engine of the truck and use the alternator or I can use a smart charger that uses mains power. The battery bank is rated at 345 Amp hours at 24 Volts which takes several hours to charge. The alternator on the truck seems to output an average in the neighborhood of 50 amps at 28 volts while the car charger can only output 15 Amps at 14 volts.

Sorry for the shaky camera work, I didn’t have any of my usual weights or stands with me.

Deuce and a Half, Video

Power Failures

February 10th, 2010
Comments Off

My area is suffering from snow and high winds, so power may not be very reliable at the moment. Although I am using my Deuce and a Half as a backup power system it can take some time to switch things over from regular house wiring to backup power. If the site goes down it is either in the process of having the power source switched or my internet connection has been physically separated.

Fun fun fun.

This Site